A further clarity issue emerged in the scheduling view: a single pending status conflated permission to author an engineering plan with permission to execute it. The revised structure exposes these as separate columns in every execution wave. Planning may begin while producer contracts are still being finalized, but the executable handoff must bind accepted inputs and pass its own checks. Repeated plan rows represent slices within one plan, avoiding duplicate plan ownership. A single summary document owns the waves and checkpoints, with former duplicate flow documents reduced to references. This verifies document consistency and dependency structure; it does not establish runtime readiness.
Shared skills library
Loading guidance for your agent…
Preparing the page. No content is being changed.